Project information
The company was able to take their new manufacturing site in Florstadt into operation on 14th November 2005, after a construction time of just seven months from the celebratory ground-breaking on 15th April 2005.
The exceptional co-operation between the client and all those involved in the project meant that the scheduled construction time was beaten by six weeks.
Over a production, storage and office space of around 10,000 square metres, complete assembly kits are manufactured for board walls, tipper-truck bodies and doors, along with other Pommier products destined for distribution throughout Europe.
Complete construction project implementation
Althoff Industrie- und Verwaltungsbau GmbH
Enster Str. 15
59872 Meschede
www.althoff-industriebau.de